中文英文
 News


  

Cracks appeared in Japan Hitachi express train ,widespread suspension of rail service appeared in Br
来源: 点击数:553次 更新时间:2021/5/10 10:19:26


Cracks appeared in Japan Hitachi express train ,widespread suspension of rail service appeared in Britain 

(Observer Network)Last Saturday(May.10),There was a widespread suspension of rail service in England.The reason was that there was cracks in train chassis/ˈʃæsi/  in part of express train made by Japanese Hitachi.Hitachi company has apologized for this accident,said some of express train has resumed service after being checked for safety.However the reason for crack is still in investigation.This wasn’t the first problem for Hitachi express.


 Reported by BBC on May 9 ,Minister of Railways Chris Heaton-Harris said on May 8,they found the crack on daily routine check on that morning.The same types of express had resume to service after Hitachi company’s safety check confirmation.However the express train is likely to remain out of service for some time.”Safety is absolutely the first priority for us ,all high-speed train of this types had to be out of service for completely strict checking.Said by Harris,”So these train has resumed to service,(High speed train)is likely to out of service for a long time.”Harris said,He has required the railway company for additional workers,to help the passengers whose travel has been influenced finishing their travel or return their tickets.

Besides,He also asked the industry to have a quick and comprehensive assessment for this accident to solve the problem.The problem appeared this time was about Hitachi 800 express started to use in British in Oct 2017,being produced by Durham county of Hitachi company in northeast England.LNER,GWR,and Hull trains are running 180 series of express for this type.Great Western Rail said ,”more than one” Hitachi 800 high-speed train appeared cracks.As a precautionary measures,93 same types of expresses related to this company was examined,ten of them resuming to service after examination.Hitachi company has apologized for the rail break after the accident,confirming that they “will solve this problem quickly and safely with all of the cooperating parties.”

British Modern Railways magazine industry and technology editor Roger Ford analysis,the problem of this accident is likely to be the welding seam under the shell of the train were cracked.If it is not resolved in time,the crack will spread further.He added,about 1000 carriages to deal with,it’s a lot of work.It’s worth noting that it was not the first problem appeared in Hitachi express ,in 2017,800 type express’s first show did not going so well.In the express from Bristow to London at that time,there was an incident of big area of air conditioning water leakage has caused concern among passengers.

 

800 type Hitachi’s inner air conditioning water leakage site in 2017 took by the passenger  Figure resource:Social platform

  • Just in last month,GWR also found little crack of hanging system appearing in this type of train in daily routine examination,which led to 6 same type of trains had to be out of service.Besides British,train No. 408 Taroko Gorge has been seriously derailed in Taiwan,which led to heavy casualties.According to Taiwan media,the accident train was also related to Hitachi."Taroko Ko" is the TEMU1000 tilting train introduced by Taiwan Railway from Japan,being manufactured by Hitachi Manufacturing Co., Ltd,the The design is derived from JR Kyushu 885 series express,Local express such as (The seagulls),”Sonic” are also use this series of express.

     


上一篇:CRRC sent a letter to Mexico president ,demanding for more fair and transparent bidding process for 下一篇:Final turnover of the rail business Bombardier sold to Alstom SA is below expectation

您是本站第 位访问者© 2009 上海方德自动化设备股份有限公司.
沪ICP备12031349号-1